Commissioning Errors That Delay Kitchen Openings

Why Kitchens Miss Their Opening Dates Even When Everything Looks Ready The equipment arrived. Installation was completed. The opening date was announced. Then commissioning started — and the calendar stopped. In generic hotel kitchen projects, opening delays rarely come from missing equipment or failed inspections. Most delays appear after everything looks finished, when commissioning exposes conflicts that […]
Why Kitchen Installations Fail Despite Approved Drawings

Assumption vs Reality in Commercial Kitchen Installation Design assumption: Once drawings are approved, installation will follow smoothly. Site reality: Installation slows down, rework begins, commissioning is delayed, and opening dates slip — even though every drawing was signed. Across turnkey kitchen projects in Africa, the Middle East, and Europe, this pattern repeats itself with surprising consistency. Drawings […]
Installation Control Points in Turnkey Kitchen Projects

Where Installation Fails Most (By Project Phase) Pre‑Delivery Risks Before equipment arrives on site, most risks are already locked into the project. Missing BOQ cross‑checks, incomplete MEP readiness, or civil works not aligned with kitchen drawings often create invisible problems. In several hotel projects we encountered, equipment arrived on time but could not be installed […]