Cooking Equipments

Tandoori Ovens – Built for Indian Restaurants, Manufactured in Turkey

“Chef said we losing flavor every night. We realized — it wasn’t the recipe. It was the oven.”

From our ongoing work in Middle Eastern hotel kitchens, Indian à la carte concepts in Qatar, and curry houses in London’s suburbs, we’ve seen firsthand how tandoori ovens don’t just cook — they bring drama, aroma, and soul to the kitchen. In one project, a Dubai-based consultant asked for vented charcoal tandoors with ceramic interiors for a show kitchen near the buffet. Another client in Zanzibar wanted a safer gas-fired model that still delivered the aroma of traditional clay walls — without the open fire risk. That’s what turnkey projects need: flexibility with authenticity.

As part of our project-based kitchen manufacturing services in Istanbul, we engineer and export charcoal, gas, and electric tandoori ovens that match architectural identity, fuel constraints, menu flow, and safety codes. Whether you’re a restaurant designer, a hospitality contractor, or a kitchen equipment consultant, we co-design tandoori systems that combine artisan cooking with export-ready efficiency.

Our Turkey-made ovens are now baking naan, chicken tikka, and kebabs across hotel kitchens, Indian restaurants, resort dining outlets, industrial kitchens, and rooftop kitchens in Mauritius and Senegal.

1-Year Factory Warranty

Service in 90+ countries

Spare parts in Turkey, UAE

Model Code

Fuel Type

Exterior

Temp Range

Interior Lining

TND-700C

Charcoal

SS/Mosaic

800–950°C

Clay

TND-800G

Gas

SS

600–850°C

Ceramic

TND-700E

Electric

Black/SS

500–700°C

Refractory Brick

Optional Add-ons: View Glass Lid, Temperature Probe, Ash Tray, Smoke Damper

Every tandoori oven project requires proper site adaptation:

  • Crated modular delivery – fits elevators & narrow doors.
  • Quick setup – standard tandoor installed within 1 day.
  • Utility hook-up – gas, electric, and ventilation points matched to BOQ specs.
  • Fire-safety zoning – insulation clearance and chimney/flue guidelines provided.
  • Consultant documentation – MEP drawings + installation manuals delivered.

 

Result: A ready-to-cook oven, fully integrated into your commercial and industrial kitchen workflow.

Charcoal burns fast if insulation’s poor. That’s why we:

  • Use triple-wall fireboxes
  • Install insulation stones
  • Add lid lock for overnight retention
  • Offer hybrid mode (gas + charcoal tray)

Result: Sustainable cooking and reduced operating costs in industrial kitchens.

  • Ash box included, removable drawer
  • Firebox liner replaceable every 12 months
  • Clay surface patchable (kit included)
  • Weekly fire zone brushing recommended
  • Never use water — brush only

💡 Why Choose Our Tandoori Ovens?

Because the taste of a tandoor is the taste of fire, clay, and heat — and we don’t compromise any.

  • ✅ Turkey-Engineered for Indian Menus – Every model is developed based on real chef feedback, with design adapted to high-turnover hospitality kitchens.
  • ✅ FOH-Ready Design – Dome-shape finish, fire glow window, mosaic-clad base — ideal for show kitchens, buffets, and resort restaurants.
  • ✅ Fuel Choice Flexibility – Whether it’s electric for rooftop compliance, gas for control, or charcoal for authenticity — we manufacture all three.
  • ✅ OS&E Integration – We deliver matching skewers, naan pads, gloves, and fire tools — so you never lose a second in service.
  • ✅ Contractor Documentation Included – BOQ-ready specs, 2D/3D files, and utility planning support for consultants and procurement teams.
Commercial Kitchen Project Turkey

🔥 Product Highlights – Artisan Fire Meets Engineering

  • 🪵 Charcoal Firebox with Heat Retention Lining
  • 🔥 800–1000°C Max Cooking Zone
  • 🧱 Clay or Ceramic Inner Layer with Stainless Outer Shell
  • 📏 700×700 to 900×1000 mm body sizes
  • 🌍 CE Certified – Turkish Manufacturing Standard
  • 💡 Optional: Glass-View Door, Mosaic Exterior, Smoke Trap Hood

 

🧑‍🍳 Real Cooking Scenarios – Indian Kitchens to Fusion Concepts

We built gas-fired tandoors for a fine-dining rooftop restaurant in Nairobi — blending Indian grills with African spicing. In Doha, our electric tandoors powered a 24/7 Indian buffet line inside a 5-star hotel, complying with fire regulations while keeping naan warm around the clock. In Istanbul, we supplied a hybrid tandoor: gas core with woodchip aroma tray, for a North Indian-French fusion bistro.

No matter the cuisine twist — the oven stays authentic.

⚖️ Comparison Table – Tandoori vs Deck Ovens

Feature

Tandoori Oven

Deck Oven

Flavor Impact

High – Smoky/Charcoal

Low – Electric Bake

Temp Range

800–1000°C

250–350°C

Visual Appeal

High (flames)

Medium

Footprint

Small round base

Large rectangular

OS&E Needs

Manual tools needed

Minimal

kitchen project planning

📐 Design & Project Integration – From Layout to Flame

Every tandoori oven is not just an appliance but an architectural focal point in FOH and BOH restaurant kitchens. As part of our turnkey projects, we:

  • Provide 2D/3D layout drawings to integrate tandoors into buffet lines or live stations.
  • Coordinate with MEP engineers for ventilation, utilities, and fire-safety compliance.
  • Align tandoor placement with prep counters, refrigeration, and pass service flow.
  • Work with interior designers to match mosaic or stone façades to concept identity.
  • Ensure clearances and sightlines for maximum guest engagement.

Design-first, project-focused: ovens that cook and impress.

🌍 Project Use Cases – Hotel Kitchens, Industrial Kitchens & Indian Restaurants

  • Hotel Kitchens – Electric tandoors for all-day dining lines and room service.
  • Indian Restaurants – Gas-fired models for high-throughput kebab production.
  • Beach Resorts – Charcoal tandoors with smoke trap chimney for outdoor show kitchens.
  • Fusion Concepts – Small footprint tandoors for mixed menu formats.
  • Catering & Industrial Kitchens – Fast-setup models with wheeled chassis.

We tailor to volume, space, menu, and even plating logic.

🍢 OS&E Integration – Tandoor Accessories & Service Tools

Tandoori service needs precision. Our OS&E kits include:

  • Long & short skewers
  • Naan press pads
  • Coal ash shovel
  • Flame-resistant gloves
  • Clay patching kit
  • Thermo probes

So your chef don’t run around looking for skewers mid-service.

🧭 How to Choose the Right Tandoor

  1. 🔥 Fuel Type: Fire code limitations? Go electric. Need show flame? Go charcoal.
  2. 📐 Space Constraints: Less than 700 mm width? Choose TND-700E.
  3. 🍛 Menu Type: High skewer rotation? Gas model is best.
  4. 🧱 Design Theme: Mosaic for FOH, steel for BOH.
  5. 🧑‍🍳 Chef Training: Manual? Gas/Electric preferred.

 

🧱 Front-of-House Design Adaptations

We offer:

  • Mosaic tile cladding
  • Backlit base ring
  • Dome shape finishing
  • Custom façade colors
  • Guest-view glass window

Your tandoor, your visual identity.

 

📊 Consultant Support – Tender Docs & BOQ

We deliver:

  • Technical datasheets
  • BOQ-spec formats (Excel, PDF)
  • AutoCAD block files
  • Warranty letter
  • CE Declaration

For any procurement manager, this means: zero missing doc.

❓ FAQ – Common Questions

Yes, with proper ventilation and fire safety systems.

Charcoal gives authentic aroma, gas balances control, electric suits rooftops.

Absolutely, full OS&E integration.

Yes, façades, dome color, and clay insulation tailored to your project.

BOQ-ready specs, AutoCAD blocks, CE certificates, and warranty letters are always included.

💬 Real Projects & Client Testimonials – What Our Partners Say

Request A Quote

Get a Quote.